Cambridgeshire: Latest traffic and travel updates for October 5

Church Lane – Ely 

Closed today (October 5) between the hours of 9:30am and 3:30pm due to works by Openreach. 

High Street/School Lane and Church Lane – Fulbourn 

Closed from 8pm today (October 5) until 6am on October 6 for carriageway works. 

B1098 – Sixteen Foot Bank, Stonea     

The road under the level crossing will be closed both ways to all traffic until October 6 between 8am and 4.45pm due to works by Network Rail.    

The Row – Sutton    

The road between Hillside and the B1381 Chain Causeway will be closed both ways to all motor vehicles until October 6 due to works by UK Power Networks.    

Shakespeare Road – Eaton Socon (between Great North Road and Hathaway Close)   

Closed until October 6 due to works by Cadent Gas.    

Whittlesford Road – Little Shelford (between Bridge Lane and Beech Close) 

Closed until October 27 due to works by Cadent Gas.  

Woodditton Road – Woodditton (between St Johns Avenue and Crockfords Road)    

Closed until October 6 for works. 

B1090 Station Road – Abbots Ripton (between Sawtry Way and Moat Lane)   

Closed until October 6 between 9:30am and 2:30pm daily for works.   

Stonely Road – Easton (between Church Road and Grange Croft)  

Closed until October 6 due to works by Anglian Water.   

Church Street – Thriplow    

Closed until October 6 due to works by Cambridge Water.   

Back Road – Friday Bridge   

Closed until October 6 due to works by Anglian Water.   

Wood End – Bluntisham      

Closed until October 6 due to works by Cadent Gas. 

Luke Street – Eynesbury       

The road is closed both ways to all motor vehicles until October 20 due to works by Cadent Gas.  

A141 New Road – Warboys (between B1040 Airfield Road and B1040 Fenton Road)         

Closed until October 21 between 9pm and 6am nightly for carriageway works.    

West Street – St Ives (between St George’s Road and George Yard)    

Closed until October 30 due to work by Anglian Water. 



Source link